offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Norway: Kongsberg Group Sets Up Wind Energy Division
News

June 13, 2012 · about 14 years ago

Norway: Kongsberg Group Sets Up Wind Energy Division

The Kongsberg Group (KONGSBERG) has chosen the Kongsberg Maritime facility at Lade in Trondheim, Norway as the home of its new ‘Centre for Optimum Wind Park Operation’. The new wind power division, is a joint venture between global marine technology developer Kongsberg Maritime and parent company KO

2 minutes read
  • LinkedIn
  • X
  • Email

The Kongsberg Group (KONGSBERG) has chosen the Kongsberg Maritime facility at Lade in Trondheim, Norway as the home of its new ‘Centre for Optimum Wind Park Operation’.

The new wind power division, is a joint venture between global marine technology developer Kongsberg Maritime and parent company KONGSBERG, and has been implemented to develop solutions for wind park management and operations that will ultimately lower the cost of wind power generation.

“Kongsberg Maritime is a world leading supplier of automation equipment to ships and the offshore sector. Our experience and technology is completely transferrable to the wind power segment and we believe that we can offer a strong portfolio of solutions to support wind park operational efficiency and predictability,” comments Andreas Jagtøyen, Vice President, Merchant Marine Trondheim, Kongsberg Maritime.

The possibilities of Kongsberg Maritime’s contribution to wind power generation are already being realised through the Windsense R&D project, which is a vital element of the company’s commitment to the sector. The project is supported by the Research Council of Norway and headed by the new wind power division at Kongsberg Maritime Lade, in partnership with eight other companies and R&D institutions.

Wind park management and monitoring are the two main focuses of the new division. There is a clear case for transferring Kongsberg Maritime’s proven maritime and offshore systems to benefit the production of wind power and to meet the challenges the sector faces. Weather conditions can make wind parks inaccessible to personnel for long periods, and any stoppage results in major economic consequences, so the possibilities of advanced monitoring and automation systems are extremely attractive to operators. The wind park management focus will aim at maximum operational predictability and profitability of the wind park’s power generation.

“As more and more offshore wind parks are built, good systems for remote monitoring and diagnostics, as well as calculating remaining economic life, will be particularly important,” continues Jagtøyen . “Our focused technology development will result in sophisticated systems for monitoring and condition-based maintenance, thus reducing maintenance costs and non-scheduled downtime. Such a system has clear parallels to the solutions we develop for integrated operations in the offshore oil and gas sector.”

The wind power sector is growing fast globally and KONGSBERG is committed to making a solid contribution to the targeted 30% reduction in cost price per kilowatt hour, which in turn will boost the competitiveness of wind power.[mappress]

Offshore WIND staff, June 13, 2012; Image: alpha ventus

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago