offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›UK: Vattenfall in Quest for Missing Wave Measurement Buoy
News

June 28, 2012 · about 14 years ago

UK: Vattenfall in Quest for Missing Wave Measurement Buoy

After one of Vattenfall’s wave measurement buoys disappeared from its anchoring place, the company had to assure the residents of the Shetland Islands that the proposed Aegir wave farm will be firmly anchored. Last year, Vattenfall deployed two buoys around 2 kilometres to the west of the south tip

1 minutes read
  • LinkedIn
  • X
  • Email

After one of Vattenfall’s wave measurement buoys disappeared from its anchoring place, the company had to assure the residents of the Shetland Islands that the proposed Aegir wave farm will be firmly anchored.

Last year, Vattenfall deployed two buoys around 2 kilometres to the west of the south tip of Burra and one of them has gone missing in spring of this year.

The company’s spokesman explained that the anchoring systems of the wave buoys and the proposed wave farm could not be compared, the Shetland News reports.

First of all, these buoys were attached to one point of a light mooring set, with an elastic bungee. They are purposed to easily detect the wave motion in order to ensure that design of the moorings for the farm can be completed with confidence.

Furthermore, the wave power machines have four points of mooring with heavy embedment anchors and catenary mooring sets.

Vattenfall’s partner in the wave farm project, Pelamis Wave Power, designs machines which are verified and insured using the same codes and standards as offshore oil and gas infrastructure.

As for the missing buoy, mariners have been notified to get in touch if they see it.

[mappress]

Offshore WIND staff, June 28, 2012; Image: Pelamis Wave Power

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago