offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›UK: Proposed Electrical Network Connections Raise Concerns
Authorities

July 2, 2012 · about 14 years ago

UK: Proposed Electrical Network Connections Raise Concerns

RWE npower renewables proposed electrical network connections in East Lindsey has created numerous concerns among the Councilors of this area, Skegness Standard reports. The firm’s solutions to the connection of its offshore Triton Knoll wind farm with a substation in Bicker Fen could have disruptiv

1 minutes read
  • LinkedIn
  • X
  • Email

RWE npower renewables proposed electrical network connections in East Lindsey has created numerous concerns among the Councilors of this area, Skegness Standard reports.

The firm’s solutions to the connection of its offshore Triton Knoll wind farm with a substation in Bicker Fen could have disruptive impacts to the community.

The company’s initial plans were to set up underground DC cabling. Reportedly, they now plan to build AC cabling.

AC cabling is cheaper but requires a number of ‘reactive compensation compounds’ to balance the power being generated.

The councilors believe that this second option has been chosen to save money.

Councilor Colin Davie stated: “It’s quite clear that this is an attempt to save money by going for the cheapest option while enabling the company to claw back its investment by connecting numerous on shore wind farms to its proposed route, which is unacceptable.”

Official from RWE says that no decision has yet been made regarding the cable route or what the electrical infrastructure will comprise for the project.

[mappress]

Offshore WIND staff, July 2, 2012; Image: RWE

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesGrid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

14 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

14 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago