offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Denmark: Bladt Finishes Final Foundation for Anholt
News

July 19, 2012 · about 14 years ago

Denmark: Bladt Finishes Final Foundation for Anholt

Late last night, the final foundation for the Anholt Offshore Wind Farm was finished. The crew had been working hard through the day to finish the final one of the 111 foundations which they have been working on for the past months. Now the last ones are finally ready to be shipped from Bladt Indust

1 minutes read
  • LinkedIn
  • X
  • Email

Late last night, the final foundation for the Anholt Offshore Wind Farm was finished. The crew had been working hard through the day to finish the final one of the 111 foundations which they have been working on for the past months. Now the last ones are finally ready to be shipped from Bladt Industries in Aalborg – right on schedule.

This, however, does not mean that the employees at Bladt can be idle because the production is still running at full speed in Aalborg. Fabricating the foundations for West of Duddon Sands is one of the next projects on the agenda along with a substation for Northwind and a substation, a jacket and foundations for Borkum RIffgrund I.

[mappress]

Offshore WIND Staff, July 19, 2012; Image: Bladt Industries A/S

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 2 months ago

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 2 months ago
Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago