offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Belgium: 12 Wind Turbine Foundations Depart Zeebrugge
News

August 21, 2012 · about 14 years ago

Belgium: 12 Wind Turbine Foundations Depart Zeebrugge

In the port of Zeebrugge Jan De Nul NV, branch of Jan De Nul Group, is constructing 16 concrete wind turbine foundations by order of the Swedish client Eon. The foundations were built on 2 pontoons in the inner harbour of Zeebrugge in 4 phases: concrete slab, retaining walls, central shaft and iceco

1 minutes read
  • LinkedIn
  • X
  • Email

In the port of Zeebrugge Jan De Nul NV, branch of Jan De Nul Group, is constructing 16 concrete wind turbine foundations by order of the Swedish client Eon.

The foundations were built on 2 pontoons in the inner harbour of Zeebrugge in 4 phases: concrete slab, retaining walls, central shaft and icecone. The height of these elements ranges from 15 to 25 m. The heaviest element weighs approximately 1,940 tons. What makes this project so unique is that the large and heavy foundation elements are constructed on pontoons and in a very short period of only 5 months.

The biggest pontoon departed the port successfully yesterday at 6 p.m.

The design, the construction, as well as the installation at sea are executed by Jan De Nul Group.

[mappress]

Offshore WIND staff, August 21, 2012; Image: jandenul

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago