offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Denmark: Bladt Finishes Foundations for 6 MW Gunfleet Sands Wind Turbines
News

August 29, 2012 · about 14 years ago

Denmark: Bladt Finishes Foundations for 6 MW Gunfleet Sands Wind Turbines

On Friday afternoon, August 24, the employees at Bladt finished the two transition pieces that the company has fabricated for DONG Energy. The two 350 tonnes transition pieces and the monopiles, each 406 tonnes of weight, make up the foundations for two of Siemens’ new 6 MW wind turbines that will b

1 minutes read
  • LinkedIn
  • X
  • Email

On Friday afternoon, August 24, the employees at Bladt finished the two transition pieces that the company has fabricated for DONG Energy.

The two 350 tonnes transition pieces and the monopiles, each 406 tonnes of weight, make up the foundations for two of Siemens’ new 6 MW wind turbines that will be tested at Gunfleet Sands Wind Farm off the UK coast. The foundations are designed and developed to last for 25 years, while the wind turbines are developed to last 20 years.

In week 36, the transition pieces will be loaded onto a pram and shipped to their destination at Gunfleet Sands off the UK coast.

The wind turbines are expected to be installed at the turn of the year, and until then the transition pieces are covered with a specially designed cover to protect the electrical installations inside.

[mappress]

Offshore WIND staff, August 29, 2012; Image: Bladt

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago