offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Sweden: Systecon Performs Availability Analyses on East Anglia Project
Operations & Maintenance

August 29, 2012 · about 14 years ago

Sweden: Systecon Performs Availability Analyses on East Anglia Project

The consultancy and software developer Systecon AB, a company with extensive expertise and experience in operation and maintenance analysis, performs simulations to analyze different logistics concept for East Anglia Offshore Wind, a joint venture between Scottish Power and Vattenfall. East Anglia O

2 minutes read
  • LinkedIn
  • X
  • Email

The consultancy and software developer Systecon AB, a company with extensive expertise and experience in operation and maintenance analysis, performs simulations to analyze different logistics concept for East Anglia Offshore Wind, a joint venture between Scottish Power and Vattenfall.

East Anglia Offshore Wind is a joint venture company between Vattenfall and Scottish Power with the purpose to develop the Round 3 development zone East Anglia in the North Sea off the British east coast. It is estimated that once completed the East Anglia project will comprise 7200 MW of installed wind power.

Operation and Maintenance (O&M) of offshore wind power is complicated. A wind farm should obviously be constructed where the wind is strong in order to ensure a good production. However, site conditions set restrictions on the accessibility to perform O&M work on the wind turbines, and a harsher climate normally results in a more expensive O&M solution.

Systecon has been engaged to model and simulate different O&M logistic concepts for the first 1200 MW construction phase of East Anglia.

The wind farm is modelled in Systecons simulation tool SIMLOX and the analyses are based on meteorological data from the planned location, wind turbine data, and data for the alternate O&M resources (e.g. vessels and helicopters) that are currently being considered in the different logistic concepts. Since meteorological data is present and included in the simulation, the wind farm availability can be studied both on a time basis and on an energy basis.

Wind power production varies with the strength of the wind and down times due to maintenance should preferably coincide with low wind periods, hence is the energy based availability arguably the more relevant measure since it takes production into account.

Pär Attermo , O&M Development , Vattenfall Renewables comments:

“As a result of the analyses Systecon performs we can decrease the uncertainty in our calculations and the value this bring in a project as large as East Anglia cannot be underestimated. Our approximation is that £3-6 million can be saved annually by choosing the best logistic concept.”

[mappress]

Offshore WIND staff, August 29, 2012; Image: eastangliawind

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceR&D

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago
New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

19 days ago