offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Germany: MMT Completes Geophysical Cable Route Survey for Amrumbank OWF
Grid Connection

September 14, 2012 · about 14 years ago

Germany: MMT Completes Geophysical Cable Route Survey for Amrumbank OWF

MMT (Sweden) has recently completed a geophysical cable route survey for the Amrumbank West offshore wind farm (OWF) project for Siem Offshore Contractors GmbH. The geophysical survey was performed by MMT for the entire inner array grid cable route. The geophysical survey included bathymetric and si

1 minutes read
  • LinkedIn
  • X
  • Email

MMT (Sweden) has recently completed a geophysical cable route survey for the Amrumbank West offshore wind farm (OWF) project for Siem Offshore Contractors GmbH. The geophysical survey was performed by MMT for the entire inner array grid cable route.

The geophysical survey included bathymetric and side-scan sonar survey as well as sub-bottom profiling. At first a magnetometer was piggy-tailed behind the towed instruments from the MMT survey vessel IceBeam for detection of unexploded ordnance (UXO). Based on the results of this magnetic anomalies survey a ROV equipped with a gradiometer array was then used for additional target inspections. The overall length of the geophysical survey was 550 km within the OWF area of 36 km². Furthermore geotechnical site investigations have been performed to verify the findings of the geophysical survey, whereby a.o. CPT tests were undertaken.

The OWF is situated within the German Bight sector of the North Sea, north of the island of Helgoland and west of the island of Amrum. Hereby the OWF will consist out of 80 wind turbine generators and shall be interconnected by an inner array grid medium voltage (MVAC) cables with a total length of up to 86km.

[mappress]

Press release, September 14, 2012; Image: mmt

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

15 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

25 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

15 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

17 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

25 days ago