offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›EnBW Requires Offshore Wind Farm Monitoring Services (Germany)
News

November 16, 2012 · about 13 years ago

EnBW Requires Offshore Wind Farm Monitoring Services (Germany)

As part of the offshore installation phase of the wind farm building, EnBW Systeme Infrastruktur Support GmbH requires services in the field of Health, Safety and Environmental monitoring and control (HSE) and quality assurance (QA) or control (QC). These services are divided into three lots; Lot 1:

2 minutes read
  • LinkedIn
  • X
  • Email

As part of the offshore installation phase of the wind farm building, EnBW Systeme Infrastruktur Support GmbH requires services in the field of Health, Safety and Environmental monitoring and control (HSE) and quality assurance (QA) or control (QC).

These services are divided into three lots; Lot 1: HSE coordination; Lot 2: QA coordinator; Lot 3: Offshore Observer of offshore installations.

Lot 1 comprises further the safety and health coordination (HSC) for construction site regulations and is thus part of the reporting chain and safety coordinator. Lot 2 and 3 contain additional supervision in the construction field. To minimise personnel expenses, provision of these services with the help of a small group of people as possible and to exploit synergies, while under the supervision and QC monitoring is also paid to the HSE monitoring and vice versa.

EnBW Renewables GmbH prefers to assign the following services as a package to a strong supplier: The coordinators are stationed at the base expected Sassnitz. The offshore Observer will pay attention to the installation and equipment in the offshore construction site “EnBW Baltic 2” and the transfer Sassnitz / Mukran. Part of the assignment is also the professional training of offshore Observer including the preparation of training material.

The offshore installations are probably 24 hours on 7 days (24/7), must run a week and constantly in shifts. At leaat one HSE Coordinator will always be present, with a QC Coordinator present on a normal working day. Tenders may be submitted for all lots.

[mappress]

Offshore WIND Staff, November 16, 2012; Image: EnBW

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago