offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›UAE: Seajacks Holds Official Steel Cutting Ceremony for 4th Vessel
News

November 20, 2012 · about 13 years ago

UAE: Seajacks Holds Official Steel Cutting Ceremony for 4th Vessel

The official Steel Cutting Ceremony for Seajacks’ fourth vessel was held on 20 November 2012 at Lamprell’s Hamriyah facility in Dubai. Self-propelled and self-elevating, Seajacks Hydra has been specifically designed for installation and maintenance services in the offshore wind and oil and gas secto

1 minutes read
  • LinkedIn
  • X
  • Email

The official Steel Cutting Ceremony for Seajacks’ fourth vessel was held on 20 November 2012 at Lamprell’s Hamriyah facility in Dubai.

Self-propelled and self-elevating, Seajacks Hydra has been specifically designed for installation and maintenance services in the offshore wind and oil and gas sectors. The vessel will be equipped with a high speed jacking system, 400t crane and be able to operate in water depths up to 48m.

Lamprell Energy has built all three of Seajacks’ current vessels; Kraken, Leviathan and Zaratan, delivering each on time and on budget. Since becoming operational from 2010, Seajacks vessels have installed 230 turbines on wind farm projects in the UK and performed work for major oil and gas clients including ExxonMobil, TAQA and Shell.

Seajacks Kraken is currently undertaking a two year well intervention and maintenance campaign for Shell UK and NAM in the Southern North Sea, while Seajacks Leviathan and Seajacks Zaratan work in tandem on the construction of the Meerwind Offshore Wind Park in Germany.

Seajacks Hydra is scheduled for delivery in the second half of 2014.

[mappress]

Press release, November 20, 2012; Image: Seajacks

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago