offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›China Longyuan Power Plans 1,000MW of Offshore Wind Power by 2015
News

November 26, 2012 · about 13 years ago

China Longyuan Power Plans 1,000MW of Offshore Wind Power by 2015

Asia’s largest developer of wind farms, China Longyuan Power, plans to increase its offshore generating capacity from existing 182MW to 1,000MW by 2015, the company secretary Jia Nansong is cited by Power Engineering news portal as saying. Though this move is technically challenging and requires con

1 minutes read
  • LinkedIn
  • X
  • Email

Asia’s largest developer of wind farms, China Longyuan Power, plans to increase its offshore generating capacity from existing 182MW to 1,000MW by 2015, the company secretary Jia Nansong is cited by Power Engineering news portal as saying.

Though this move is technically challenging and requires considerable amounts of financing, the company plans to use half of the proceeds of the new share issue to fund construction of onshore wind farms, 20 % to finance offshore wind farms, 15 % for overseas wind and solar power projects, 5 % for mainland solar projects, and the rest to boost working capital, according to Power Engineering news portal.

The company has just commercially put into operation its 150MW Intertidal Offshore Demonstration Wind Farm, which can feed about 375 million kWh power to the grid per year, with more than 2,500 hours of available wind power time.

Chinese wind industry is trying to move from northern regions to coastal provinces, to build offshore wind farms close to consumption centres, as the northern part of the country faces power transmission blockages due to very fastwind energy projects’ development.

[mappress]

Offshore WIND Staff, November 26, 2012

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago