offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›USA: Deepwater Wind Could Complete Block Island Wind Energy Project in 2015
News

December 26, 2012 · about 13 years ago

USA: Deepwater Wind Could Complete Block Island Wind Energy Project in 2015

Block Island offshore wind farm developer sad that the completion date for this project is likely to be pushed into 2015, reports Associated Press. However, the company did not exclude the possibility of completing the project in 2014. Deepwater wind is awaiting federal approvals to commence the con

1 minutes read
  • LinkedIn
  • X
  • Email

Block Island offshore wind farm developer sad that the completion date for this project is likely to be pushed into 2015, reports Associated Press.

However, the company did not exclude the possibility of completing the project in 2014.

Deepwater wind is awaiting federal approvals to commence the construction of, what could be, the USA’s first offshore wind farm.

Deepwater’s project comprises of 5 wind turbines that would be erected 3 miles off Block Island.

This 30-megawatt demonstration-scale offshore wind farm, will be connected to both Block Island and mainland Rhode Island via the bi-directional Block Island Transmission System (BITS).

[mappress]

Offshore WIND staff, December 26, 2012; Image: dwwind

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago