offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Germany: SeaRenergy to Install Two Offshore Wind Farm Converter Platforms
News

January 7, 2013 · about 13 years ago

Germany: SeaRenergy to Install Two Offshore Wind Farm Converter Platforms

SeaRenergy Offshore has been selected by Siemens for the transportation and installation of two HVDC converter platforms for the offshore wind cluster BorWin 2 and HelWin 1 in the North Sea. The platforms which consist of a base frame and a topside shall be towed from Nordic Yards in Wismar and Warn

2 minutes read
  • LinkedIn
  • X
  • Email

SeaRenergy Offshore has been selected by Siemens for the transportation and installation of two HVDC converter platforms for the offshore wind cluster BorWin 2 and HelWin 1 in the North Sea.

The platforms which consist of a base frame and a topside shall be towed from Nordic Yards in Wismar and Warnemünde to the designated sites in the North Sea.

SeaRenergy will install the converter platform BorWin 2 about 125 kilometres off the coast, northwest of the island of Borkum, in a water depth of about 40 meters.

BorWin 2 will be connected to the wind farms Veja Mate and Global Tech 1, which will have a combined power generating capacity of 800 megawatts (MW). The converter platform HelWin 1 will be installed by SeaRenergy about 85 kilometres off the coast, northwest of the island of Helgoland, in a water depth of about 23 meters.

HelWin 1 will be connected to the wind farm Nordsee Ost and Meerwind, which will have a combined power generating capacity of 576 megawatts (MW). The transport and installation of both platforms shall take place in 2013.

With these projects SeaRenergy enters new territory as it is the first time that converter platforms of this type and size will be installed offshore.

“The confidence Siemens has shown in us encourages us in our conviction that SeaRenergy offers the right solutions to the challenges of the offshore wind market” , say the co-founders and managing directors of SeaRenergy Jan B. Steffens and Kurt E.Thomsen.

[mappress]

Press release, January 07, 2013

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago