offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Blue Water Shipping Loads First Gwynt Y Mor Turbine on Seatruck Pace
News

February 4, 2013 · about 13 years ago

Blue Water Shipping Loads First Gwynt Y Mor Turbine on Seatruck Pace

In January, Blue Water Shipping loaded the ro/ro vessel “Seatruck Pace” at the Port of Esbjerg with the first turbines for the Offshore Wind Farm Gwynt Y Mor in Great Britain where a total of 160 turbines are to be installed. Blue Water has been awarded the transport contract of 130 turbines from Es

1 minutes read
  • LinkedIn
  • X
  • Email

In January, Blue Water Shipping loaded the ro/ro vessel “Seatruck Pace” at the Port of Esbjerg with the first turbines for the Offshore Wind Farm Gwynt Y Mor in Great Britain where a total of 160 turbines are to be installed.

Blue Water has been awarded the transport contract of 130 turbines from Esbjerg to Mostyn in Great Britain, in the landmark project within the wind transport industry as it is the first large scale project where a ro/ro solution is being used to transport the turbines.

“This is very exciting for us as we have been developing machinery and equipment over the last years in close cooperation with our clients. This process includes special focus on terminal optimisation and ro/ro solutions, and with the arrival of “Seatruck Pace” in Esbjerg for the first of more than 45 shipments, we have reached an important goal in our efforts to develop optimized logistics solutions for a fast growing industry” , says Business Development Manager Jacob Kjærgaard.

Blue Water has full responsibility for the entire logistic chain from terminal in Esbjerg to DAT Mostyn. This includes chartering of the “Seatruck Pace” and stevedore services in both Esbjerg and Mostyn.

The Gwynt Y Mor Wind Farm is installed off the North Wales coast, and is expected to supply energy for approx. 400.000 households by the end of 2014.

[mappress]

Press release, February 04, 2013; Image: bws

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago