offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›UK: Scira Offshore Energy Moves to O&M Base at Wind Farm Place in Egmere
News

February 6, 2013 · about 13 years ago

UK: Scira Offshore Energy Moves to O&M Base at Wind Farm Place in Egmere

The final piece of the jigsaw of the Sheringham Shoal Offshore Windfarm has been put in place with Scira Offshore Energy’s [Scira] move to a purpose-built Operation and Maintenance [O&M] base at Wind Farm Place in Egmere near Walsingham on 4thFebruary 2013. Constructed by local firm, Mansell Constru

1 minutes read
  • LinkedIn
  • X
  • Email

The final piece of the jigsaw of the Sheringham Shoal Offshore Windfarm has been put in place with Scira Offshore Energy’s [Scira] move to a purpose-built Operation and Maintenance [O&M] base at Wind Farm Place in Egmere near Walsingham on 4thFebruary 2013.

Constructed by local firm, Mansell Construction of Swaffham, Wind Farm Place is located three miles south of Wells-next-the-Sea in North Norfolk. It is a low-energy consumption building – low energy lighting, highly insulated walls, a ‘green’ roof to reduce rainwater run-off and greywater recycling of rainwater to flush toilets. With 900 sq ft of office accommodation and 400 sq ft of warehousing, Wind Farm Place will house Scira’s management and administration staff and serve as the base for the wind turbine technicians working on the maintenance of the offshore wind farm on a daily basis.

Einar Strømsvåg, Scira’s General Manager welcomes the move, saying: “The building in Polka Road in Wells, which had previously been the Field Study Centre, has served us well during the construction of the Sheringham Shoal Offshore Wind Farm, and the Prepare for Operations phase of what has been a very complex project.

“However, now that the wind farm is fully operational, the local management team is delighted to have moved into its new, purpose-built home. It will be an excellent base for our activities for many years to come.”

[mappress]

Press release, February 06, 2013; Image: scira

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago