offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›Case Study: T1200 Sheringham Shoal Offshore Cable Trenching (VIDEO)
Technology

February 7, 2013 · about 13 years ago

Case Study: T1200 Sheringham Shoal Offshore Cable Trenching (VIDEO)

In August 2012, Helix Energy Solutions Group Inc.’s robotics subsidiary, Canyon Offshore Limited (U.K.), was contracted to conduct trenching operations with the T1200 water-jet trenching system in the Sheringham Shoal offshore wind farm off the coast of the United Kingdom. The scope of work comprise

1 minutes read
  • LinkedIn
  • X
  • Email

In August 2012, Helix Energy Solutions Group Inc.’s robotics subsidiary, Canyon Offshore Limited (U.K.), was contracted to conduct trenching operations with the T1200 water-jet trenching system in the Sheringham Shoal offshore wind farm off the coast of the United Kingdom. The scope of work comprised of trenching of the inter-array cables with an approximate total length of 100km.

Canyon Offshore Limited (U.K.) completed the Sheringham Shoals project in a 62 day period that spanned from early July to September. The overall distance trenched was 49.97km, with an average of .805km trenched per day.

On its first dive, T1200 spent more than 30 consecutive hours on the bottom in trenching mode and only spent a total of 14.44 hours on downtime, equating to just 1.74% of the whole project.

The burial achieved during the project varied depending on the product. For the Infield Cable Type 1 400mm² a minimum depth of cover of 0.8m was achieved. For the Infield Cable Type 2 185mm² a minimum depth of cover of 0.5m was achieved. Readings of the burial were taken every two hours during the trenching of the project and an average can be worked out from said data.

You can find the entire Case Study here .

And here is a video of Helix Canyon Offshore’s latest seabed trencher, the T1200, as deployed on the Grand Canyon support vessel:

[mappress]

Press release, February 7, 2013; Image: Helix Energy Solutions

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago