offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›The Netherlands: KCI Completes Engineering Work for Riffgat OWF
News

March 19, 2013 · about 13 years ago

The Netherlands: KCI Completes Engineering Work for Riffgat OWF

KCI completed the engineering work for German Offshore wind project Riffgat in March 2013. In April 2010, KCI was awarded an engineering contract for structural, utility systems and 3D interfacing design for both the jacket and the topside. Just before sail away in February this year, KCI engineers

1 minutes read
  • LinkedIn
  • X
  • Email

KCI completed the engineering work for German Offshore wind project Riffgat in March 2013.

In April 2010, KCI was awarded an engineering contract for structural, utility systems and 3D interfacing design for both the jacket and the topside. Just before sail away in February this year, KCI engineers carried out a final inspection of the topside at Hollandia’s yard.

The topside set sail to the German part of the North Sea where it was successfully hooked up to the jacket foundation.

In total, 48 KCI engineers were involved in the design and 55 KCI engineers rendered support. It is the third substation that KCI designed for the Strukton Hollandia Joint Venture.

The Riffgat wind farm has a capacity of 108MW, providing electricity for approximately 100,000 households and will come on line this summer.

[mappress]

Press release, March 19, 2013; Image: KCI

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago