offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›UK: OMM Completes Feasibility Study for Forewind
News

March 21, 2013 · about 13 years ago

UK: OMM Completes Feasibility Study for Forewind

Offshore Marine Management (OMM), specialists in the offshore renewables, hydrocarbon and telecomes industry; has recently completed a feasibility study for Forewind’s planned Round 3 Dogger Bank offshore wind energy development. The study was undertaken to assess route feasibility options along one

1 minutes read
  • LinkedIn
  • X
  • Email

Offshore Marine Management (OMM), specialists in the offshore renewables, hydrocarbon and telecomes industry; has recently completed a feasibility study for Forewind’s planned Round 3 Dogger Bank offshore wind energy development.

The study was undertaken to assess route feasibility options along one of the development’s 160km long export cable corridors. The scope of work required OMM to analyse survey data, establish a Burial Protection Index (BPI) and carry out a burial assessment to recommend cable burial depths along the route. This was used to advise on the potential need for corridor widening and cable protection measures, including advising on appropriate techniques for cable burial and protection along the route.

OMM used its in-house Esri GIS facilities to assess the data provided for geology, obstructions and boulder to enable Forewind to be more informed on the potential quantities and cost of cable protection.

Oliver Taylor, Survey Manager at OMM , commented;

‘This was another successful delivery of a feasibility study, which will aid Forewind in the consenting process for one of its development stages of Dogger Bank. OMM continue to offer high quality services to Forewind, which include GIS-based data assessments, feasibility studies and other cable engineering studies’.

[mappress]

Press release, March 21, 2013; Image: offshoremm

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago