offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Preparations Underway for Turbine Installation at Riffgat Offshore Wind Farm, Germany
Wind Farm Update

April 9, 2013 · about 13 years ago

Preparations Underway for Turbine Installation at Riffgat Offshore Wind Farm, Germany

Preparations for the installation of wind turbines at the Riffgat offshore wind farm have begun in early April. Transport and loading of heavy components of the Siemens SWT 3.6, such as towers, nacelles, blades and turbines, have been performed with a special installation vessel, the “Bold Tern” fro

1 minutes read
  • LinkedIn
  • X
  • Email

Normal 0 21 false false false BS-LATN-BA X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-fareast-language:EN-US;}

Preparations for the installation of wind turbines at the Riffgat offshore wind farm have begun in early April.

Transport and loading of heavy components of the Siemens SWT 3.6, such as towers, nacelles, blades and turbines, have been performed with a special installation vessel, the “Bold Tern” from Esbjerg.

“Bold Tern”, owned by Fred Olsen, is a 132 meter-long and 39 meter-wide vessel with a loading capacity of up to 5,300 tons. It is a jack-up vessel with four extendable raising legs that allow precise positioning in the water.

The legs are around 78 meter-long and can lift the vessel from the ocean floor, thus facilitating precise construction work. The installation vessel is suitable for water depths of up to 40 meters.

The “Bold Tern” has two cranes on the deck, with a maximum tractive effort of 800 tons.

At the beginning of this week, the rotor blades for the first eight wind turbines were loaded. Nacelles and tower components will follow before the vessel departs for the installation for the first time.

[mappress]

Offshore WIND Staff, April 9, 2013; Image: enova

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago