The commissioning of the London Array’s 175th and final turbine happened at 16.09 on Saturday, 6 April. Thus, f ull capacity has now been reached at the 630MW first phase of the world’s largest offshore wind farm. The following is a video of foundation and turbine installation at the London Array Offshore Wind Farm:
[mappress]
Offshore WIND Staff, April 10, 2013; Image: londonarray