offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Spain: Gamesa Marks Further Progress on Its Offshore Strategy
News

April 12, 2013 · about 13 years ago

Spain: Gamesa Marks Further Progress on Its Offshore Strategy

Gamesa, a global technology leader in the wind power industry, has marked further progress on its offshore strategy by shipping components for its 5 MW marine turbine from the port of Bilbao to the Canary Islands (Spain). The company thus begins the process of erecting Spain’s first-ever offshore wi

2 minutes read
  • LinkedIn
  • X
  • Email

Gamesa, a global technology leader in the wind power industry, has marked further progress on its offshore strategy by shipping components for its 5 MW marine turbine from the port of Bilbao to the Canary Islands (Spain). The company thus begins the process of erecting Spain’s first-ever offshore wind turbine, at the Arinaga Quay (Gran Canaria, in the Canary Islands).

Gamesa is loading today the turbine’s three blades, nacelle and tower onto a ship bound for the Canary Islands:

After the ship docks at the Arinaga Quay in the next week, Gamesa will begin assembling the prototype of its G128-5.0 MW offshore turbine. The company expects the turbine to begin operating in the second quarter of this year and aims to secure certification in subsequent months. Certification will enable Gamesa to install an initial series of the turbine in 2014. In addition to its 5 MW offshore system, Gamesa plans to develop higher-capacity offshore turbines (7 MW-8 MW) in the medium to long term.

Gamesa in late 2012 obtained design certification for its offshore turbine from independent organisation DNV. The DNV endorsement heralded a major leap forward in the system’s development, as a guarantee of the turbine’s launch, commercial rollout and manufacture in coming years.

This offshore system, with a rotor diameter of 128 metres and a modular, redundant design, ensures reliability and maximises energy output. Gamesa’s G128-5.0 MW offshore turbine is equipped with the technology Gamesa has proven and validated in its 4.5 MW system, plus the know-how and experience acquired during the 4.5 MW’s rollout. The company invested more than half a million engineering hours in the turbine’s design process.

[mappress]

Press release, April 12, 2013; Image: gamesa

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago