offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›Siemens 6MW Offshore Wind Turbines Produce First Power at Gunfleet Sands (UK)
R&D

April 18, 2013 · about 13 years ago

Siemens 6MW Offshore Wind Turbines Produce First Power at Gunfleet Sands (UK)

The two next-generation Siemens 6MW offshore wind turbines at the Gunfleet Sands demonstration project in the UK have produced the first power. DONG Energy will use Siemens 6MW wind turbines commercially for the first time at Westermost Rough off the Yorkshire coast in the United Kingdom and has rec

1 minutes read
  • LinkedIn
  • X
  • Email

The two next-generation Siemens 6MW offshore wind turbines at the Gunfleet Sands demonstration project in the UK have produced the first power.

DONG Energy will use Siemens 6MW wind turbines commercially for the first time at Westermost Rough off the Yorkshire coast in the United Kingdom and has recently entered an agreement with Siemens to supply 154 6MW turbines for the German Gode Vind projects.

Benj Sykes, DONG Energy Wind Power’s UK Country Manager commented:

“The Gunfleet Sands demonstration project is a significant step in our work to reduce the cost of energy in offshore wind, and we’re now looking forward to greatly increasing our understanding of the operational performance of these turbines and using the learnings to inform the wider roll out of this technology in the UK over the coming years.”

The two Siemens 6MW turbines at the Gunfleet Sands demonstration site will be the first to use the direct drive technology. It is therefore an essential objective of this project to test the performance and reliability of the direct drive technology. It is also the intention to test new developments which can be used in a broader perspective on other projects in the DONG Energy portfolio.

The demonstration site is located approximately 8.5km southeast of Clacton-on-Sea, next to Gunfleet Sands 1 and 2.

[mappress]

Press release, April 18, 2013; Image: DONG Energy

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

21 days ago

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

21 days ago
New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago