offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›TenneT Requires Seabed Survey Work (Germany)
Grid Connection

April 19, 2013 · about 13 years ago

TenneT Requires Seabed Survey Work (Germany)

TenneT Offshore GmbH is responsible for the connection of the electrical substation of the offshore wind farms in the HelWin2 cluster. In order to connect the wind farms with the onshore AC grid TenneT requires seabed survey services for the potential clearance of unexploded ordnance. The wind farm

2 minutes read
  • LinkedIn
  • X
  • Email

Normal 0 21 false false false BS-LATN-BA X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-fareast-language:EN-US;}

TenneT Offshore GmbH is responsible for the connection of the electrical substation of the offshore wind farms in the HelWin2 cluster. In order to connect the wind farms with the onshore AC grid TenneT requires seabed survey services for the potential clearance of unexploded ordnance.

The wind farm area is located 33KM North West of Helgoland. The landfall of the cable route is located near Büsum, Germany.

The scope of works consists of the following lots: 1: The suspicion of the presence of unexploded ordnance (UXO) is to be examined and documented by a technical survey exploration on the cable route and 16 anchor locations.

The evaluation of the survey exploration will be executed by a third party. Based on the report a possible unknown number of UXO may need to be cleared. The anomaly plots will be handled by a third party and is not part of this scope of works; 2: If based on the evaluation of the third party no UXO risk is evaluated from the survey, then this scope of works will not be executed.

If in the case UXO risk is evaluated than based on the results of the third party evaluation the selected supplier from the tender shall start a UXO clearance operation in order to remove the x-number of selected objects; 3: Additional Survey: Based upon the quotations of LOT 1, an additional survey of 1.6 million square metres could be ordered.

[mappress]

Offshore WIND Staff, April 19, 2013; Image: Satlantic

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionR&D

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

18 days ago

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

18 days ago
New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

19 days ago