offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›UK: Tough Conditions in Irish Sea
News

May 3, 2013 · about 13 years ago

UK: Tough Conditions in Irish Sea

Orsta Marina Systems Nederland BV announced it has been selected to provide the inshore berthing pontoon for renewable energy company Dong Energy at Barrow in Furness on the north west coast of England. The pontoon will form part of the onshore O&M facilities supporting the construction of 108No off

2 minutes read
  • LinkedIn
  • X
  • Email

Orsta Marina Systems Nederland BV announced it has been selected to provide the inshore berthing pontoon for renewable energy company Dong Energy at Barrow in Furness on the north west coast of England.

The pontoon will form part of the onshore O&M facilities supporting the construction of 108No offshore wind turbines in the Irish Sea, west of Duddon Sands, a partnership project between Dong Energy Denmark and Scottish Power UK.

What makes an excellent location for wind power generation poses challenging conditions for pontoons. Following a competitive tender process Orsta were appointed by main contractor Commercial Marine & Piling Ltd (CMP) to design and manufacture the 68 metre long x 5 metre wide pontoon for the fleet of support and maintenance vessels. The exposed local conditions include a tidal variation 11 metres and average wind speed of 63km/h.

The precast concrete pontoon units will be manufactured close to the site within the Port of Barrow. Each unit will be 22.65 metres long x 4.8 metres wide x 2 metres depth and will weigh between 70 and 80 tonnes. The pontoons will be moored on 4No 1220mm diameter steel tubular piles which will be installed into rock sockets by CMP. Access and egress to the pontoon will be provided by a 34.5 metre long tidal access bridge and in addition to electrical light and power services the pontoons will be installed with high speed re-fuelling services, sewage and bilge water pump out services and a dockside crane such that turnaround times for support vessels are minimised.

[mappress]

Press release, May 3, 2013; Image: orstamarina

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago