offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›First Wind Turbine Installed at Riffgat Offshore Wind Farm (Germany)
Wind Farm Update

May 6, 2013 · about 13 years ago

First Wind Turbine Installed at Riffgat Offshore Wind Farm (Germany)

The first of a total of 30 wind turbines for EWE’s Riffgat offshore wind farm at the North Sea has been installed. “Further seven turbines are already on board the specialized vessel, so that Riffgat will now continue to grow very rapidly,” says EWE’s Dr. Torsten Köhne. The plan is to have the wind

2 minutes read
  • LinkedIn
  • X
  • Email

Normal 0 21 false false false BS-LATN-BA X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-fareast-language:EN-US;}

The first of a total of 30 wind turbines for EWE’s Riffgat offshore wind farm at the North Sea has been installed.

“Further seven turbines are already on board the specialized vessel, so that Riffgat will now continue to grow very rapidly,” says EWE’s Dr. Torsten Köhne . The plan is to have the wind farm ready by summer.

“If everything continues to run well, Riffgat will be Germany’s first fully erected commercial wind farm in the North Sea,” Köhne announced.

After the start of construction in June last year, the project team had initially built all the foundations for the offshore wind turbines and completed the wiring inside the park. The substation, situated in the center of the wind farm, was installed in February.

Now, everything is ready for the SWT-3.6-120 wind turbines that have been made ​​in the recent months by Siemens in Denmark. The tower sections, nacelles and rotor blades are loaded in Esbjerg on the installation vessel “Bold Tern” from the Norwegian shipping company Fred Olsen WindCarrier. From there, the components go toward Borkum Riffgat. The vessel will commute four times in the coming weeks, until all systems are installed at their destination.

[mappress]

Offshore WIND Staff, May 6, 2013; Image: EWE

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago