offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›France: Alstom 6MW Offshore Wind Turbine Completes Power Performance Measurement
News

May 6, 2013 · about 13 years ago

France: Alstom 6MW Offshore Wind Turbine Completes Power Performance Measurement

Alstom’s new-generation Haliade™ 150 – 6MW offshore wind turbine has successfully obtained the IEC power performance measurement (power curve) after 3 months of performance measurements at Le Carnet site, in France. This key milestone in the type testing certification process follows on from the com

2 minutes read
  • LinkedIn
  • X
  • Email

Alstom’s new-generation Haliade™ 150 – 6MW offshore wind turbine has successfully obtained the IEC power performance measurement (power curve) after 3 months of performance measurements at Le Carnet site, in France.

This key milestone in the type testing certification process follows on from the completion of the 6MW commissioning and exhaustive testing activity.

The onshore tests performed on the first Haliade™ 150 – 6MW since March 2012 have provided extensive data collection on the power curve which confirmed the technical specifications and correlate extremely well with the design models of the Haliade™ 150 -6MW wind turbine.

The next phase of activity on the first onshore machine will focus on specific tasks and extensive tests related to wind turbine diagnostics, reliability and maintenance of main components such as the generator, pitch, converter and the yaw system. The remaining tests included in the type testing certification are expected to be finalised during this phase in order to obtain the certification of the turbine before the end of 2013.

After the certification, Le Carnet site will be dedicated to complementary performance upgrade tests, and several training actions.

“We are proud to reach this important milestone in the certification plan of our machine in such a short time with the level of performance we had expected” , stated Alstom Wind Offshore VP Frederic Hendrick.

“During this last year, the activity in Le Carnet has been massive in terms of measurements and test work. These have been focused on the validation of the characteristics and the performance of the Haliade™ 150 wind turbine according to Alstom’s internal protocols and the main international standards” , specified Alstom Wind Innovation VP Jordi Puigcorbé.

[mappress]

Press release, May 6, 2013; Image: alstom

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago