offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›First Transition Piece Installed at DanTysk Offshore Wind Farm (Germany)
Wind Farm Update

May 8, 2013 · about 13 years ago

First Transition Piece Installed at DanTysk Offshore Wind Farm (Germany)

The first transition piece (TP) was grouted at the DanTysk Offshore Wind Farm on location DT01 on the 1st of May. Since the Seafox 5 first entered the DanTysk field it has been too cold for the installation of the TPs. Monopiles have been left standing, just barely visible above the waters surface.

1 minutes read
  • LinkedIn
  • X
  • Email

The first transition piece (TP) was grouted at the DanTysk Offshore Wind Farm on location DT01 on the 1st of May.

Since the Seafox 5 first entered the DanTysk field it has been too cold for the installation of the TPs. Monopiles have been left standing, just barely visible above the waters surface.

For the installation of the TPs, grout (concrete) has to be filled into the gap between MP and TP. Until now, the seawater and/or air have always been too cold to harden the grout quickly enough and the possibility of disrupting the material itself should be avoided under such conditions.

Installation of the first TP as late as May 1st was unforeseen.

However, the “foundation stone / Grundstein / grundsten” has now been laid, following the German tradition of placing a sealed cornerstone deep in the first foundation.

[mappress]

Press release, May 8, 2013; Image: Vattenfall

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago