offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›Marine Scotland Rejects Tidal Array Application from GlaxoSmithKline
Authorities

May 9, 2013 · about 13 years ago

Marine Scotland Rejects Tidal Array Application from GlaxoSmithKline

Marine Scotland has rejected a license application for a project comprising 15 tidal turbines at the Montrose Basin in Scotland, for which a License Application and Environmental Statement were submitted by a pharmaceutical and healthcare company GlaxoSmithKline (GSK) in March last year. The authori

2 minutes read
  • LinkedIn
  • X
  • Email

Marine Scotland has rejected a license application for a project comprising 15 tidal turbines at the Montrose Basin in Scotland, for which a License Application and Environmental Statement were submitted by a pharmaceutical and healthcare company GlaxoSmithKline (GSK) in March last year.

The authority has explained its refusal in a letter to GSK, saying: “Marine Scotland Licence Operations Team (MSLOT) have reviewed the information submitted by GSK and concluded that given the sensitive nature of the location, affecting 3 Natura Sites, a marine licence should not be issued.

“The decision is based upon the high sensitivity of the site; the poor state of some of the qualifying species; and the difficulty in quantifying the likely significant effects.”

The tidal array would have been installed in 2 phases with a total capacity of up to 0.7MW. Tidal turbines with gravity foundations were proposed to be placed on either side of the road bridge at Montrose. They would have transmitted power to the shore where they would be connected to a shore station, transmitting electricity to the GSK Montrose plant.

However, GSK is looking to find an alternative more suitable to the site and is now working with Marine Scotland on another proposal which uses bladeless turbines, which were tested and proven at the EMEC (European Marine Energy Centre), Montrose Review news site informs.

“The company intends to submit to Marine Scotland an application for a generation licence to deploy and monitor a single turbine in the river close to Montrose bridge. Should Marine Scotland grant the application and the trial proves successful, GSK would seek permission to install a further five turbines,” the news site quotes GSK’s spokesman as saying.

[mappress]

Offshore WIND Staff, May 9, 2013; Image: swanturbines

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Authorities

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

700 MW Lithuanian Offshore Wind Project Gets Environmental Protection Agency’s Green Light
Authorities

700 MW Lithuanian Offshore Wind Project Gets Environmental Protection Agency’s Green Light

28 days ago

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction
Authorities

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction

29 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

700 MW Lithuanian Offshore Wind Project Gets Environmental Protection Agency’s Green Light
Authorities

700 MW Lithuanian Offshore Wind Project Gets Environmental Protection Agency’s Green Light

28 days ago
CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction
Authorities

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction

29 days ago