offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›UK: IMCA Releases Guidance on DP Positioned Jack-ups
News

May 17, 2013 · about 13 years ago

UK: IMCA Releases Guidance on DP Positioned Jack-ups

An increasing number of members of the International Marine Contractors Association (IMCA) are involved with the offshore renewables sector and for this reason the association has published ‘Guidance for the Positioning of Dynamically Positioned (DP) Jack-up Vessels on and off the Seabed” (IMCA M223

2 minutes read
  • LinkedIn
  • X
  • Email

An increasing number of members of the International Marine Contractors Association (IMCA) are involved with the offshore renewables sector and for this reason the association has published ‘Guidance for the Positioning of Dynamically Positioned (DP) Jack-up Vessels on and off the Seabed” (IMCA M223) and an updated version of their information note The Inspection and Auditing of Manned and Unmanned Barges’. Both are aimed at ensuring and enhancing offshore safety.

“The aim of IMCA M223 is to provide the owners and operators of dynamically positioned (DP) jack-up vessels with guidance to create procedures for going onto and leaving location,” explains IMCA’s Technical Director, Jane Bugler. “A DP system interfaces with the vessel’s propulsion systems to hold the vessel in position against external forces (such as wind and waves) that are acting to move the vessel.

“For DP vessels with jack-up capability – when a vessel moves into position on DP but intends to undertake the work on location as a jack-up vessel – there can potentially be excessive stresses induced into the legs during the transitional period from being on DP to ‘leg touchdown’ to soft pinning of the legs. The first leg contact with the seabed will restrict the vessel’s motion which may indicate a position error to the DP system. This could the lead to an increase of thrust of the vessel’s positioning propulsion systems and consequently may impart these excessive stresses on the legs.”

IMCA M223 has sections on Risk Analysis (vessel characteristics; environmental conditions and loading; site specific assessment integrity; and DP specification and performance); Background Material (that encompasses company procedures; vessel procedures; and information for each location); and covers Procedures for a DP Jack-up Vessel Going on and Leaving Location.

[mappress]

Press release, May 17, 2013; Image: seajacks

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago