offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›UK: Case Study on ‘Human Free’ Met Mast Installation at Dogger Bank Available on Web
Technology

May 22, 2013 · about 13 years ago

UK: Case Study on ‘Human Free’ Met Mast Installation at Dogger Bank Available on Web

A case study on the fact the Dogger Bank meteorological mast project, the first in the UK to use a “human-free” technique to place the lattice tower of the mast on top of the awaiting foundation, is now available on the website. Lightweight plastic cones and video cameras were affixed to the tower s

1 minutes read
  • LinkedIn
  • X
  • Email

A case study on the fact the Dogger Bank meteorological mast project, the first in the UK to use a “human-free” technique to place the lattice tower of the mast on top of the awaiting foundation, is now available on the website .

Lightweight plastic cones and video cameras were affixed to the tower sections before any lifting activity was undertaken, which alleviated the need for riggers to physically be in position while manoeuvring the towers into place.

This technique was both safer than traditional methods, as it enabled the crew to stay on deck away from the lifting hazards, and also much faster as the cones helped to quickly stabilise the load in the final stage of the lifting.

With riggers being physically removed from the lattice towers during installation, and through the use of guide cones and video cameras, it eliminates the risk of an accident being caused by a swinging or falling load. The use of guide cones enables the crew to stay on the vessel deck, and away from the lifting hazards.

Therefore it is both safer than methods used previously, and a far more efficient means of installation as the cones helped to quickly stabilise the tower in the final stage of the lifting.

[mappress]

Press release, May 22, 2013; Image: Forewind

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago