offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Sweden: Cable Repair Starts at Lillgrund OWF
Grid Connection

May 24, 2013 · about 13 years ago

Sweden: Cable Repair Starts at Lillgrund OWF

Since May 12, the Lillgrund offshore wind farm has been standing still. The work to repair the export cable – which transmits the electricity from the wind farm to the substation on land – is underway. “Our focus is to replace the damaged section of the cable as soon as possible and get the producti

1 minutes read
  • LinkedIn
  • X
  • Email

Normal 0 21 false false false BS-LATN-BA X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-fareast-language:EN-US;}

Since May 12, the Lillgrund offshore wind farm has been standing still. The work to repair the export cable – which transmits the electricity from the wind farm to the substation on land – is underway.

“Our focus is to replace the damaged section of the cable as soon as possible and get the production up and running again,” says Fredrik Forslund, site manager at Lillgrund . “Yesterday, May 23, we got the green light from the County Administration to begin work to replace the damaged part of the export cable.”

Weather permitting, the plan is to cut and remove the damaged part of the export cable on Monday, May 27. About 75 meters of the 7 kilometer long submarine cable needs to be replaced.

After the cable section is removed from the seabed, it will be analyzed to determine what caused the damage.

[mappress]

Offshore WIND Staff, May 24, 2013; Image: Vattenfall

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionOperations & Maintenance

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago