offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Gamesa Assembles Spain’s First Prototype Offshore Wind Turbine
News

May 28, 2013 · about 13 years ago

Gamesa Assembles Spain’s First Prototype Offshore Wind Turbine

This morning Gamesa completed assembly of the main parts (tower, nacelle and blades) of Spain’s first prototype offshore wind turbine, which has been installed at the Arinaga Quay in Gran Canary Island. Installation of the tower, nacelle and the three blades, which were shipped from Bilbao port to t

2 minutes read
  • LinkedIn
  • X
  • Email

This morning Gamesa completed assembly of the main parts (tower, nacelle and blades) of Spain’s first prototype offshore wind turbine, which has been installed at the Arinaga Quay in Gran Canary Island.

Installation of the tower, nacelle and the three blades, which were shipped from Bilbao port to the Canaries, began in the middle of April with the tower assembly work. The tower measures 90 metres in total and is made by Windar (a joint venture between Gamesa and Daniel Alonso).

The nacelle, made in Tauste (Zaragoza), measures over 12.5 metres long and is 4 metres tall and wide. It weighs 72 tonnes. Once the nacelle was hoisted onto the tower, work began to assemble the three blades, each of which measures 62.5 metres long and weighs 15 tonnes, making them the longest blades ever produced and transported in Spain. This work finished this morning.

Gamesa will now begin the turbine’s electrical assembly and grid connection work with a view to putting it into operation in the third quarter of the year and achieving certification in the months thereafter. This would enable installation of the initial offshore units in 2014.

This offshore system, with a rotor diameter of 128 metres and a modular, redundant design, ensures reliability and maximises energy output. Gamesa’s G128-5.0 MW offshore turbine is equipped with the technology Gamesa has proven and validated in its 4.5 MW system, plus the know-how and experience acquired during the 4.5 MW’s rollout. The company invested more than half a million engineering hours in the turbine’s design process.

[mappress]

Press release, May 28, 2013; Image: gamesa

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago