offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Baltic Workboats Builds OWF Service Catamaran for German Owner
News

June 26, 2013 · about 13 years ago

Baltic Workboats Builds OWF Service Catamaran for German Owner

The Christening ceremony of Wind Force II, a wind farm catamaran built by Baltic Workboats, occurred end of May 2013 in Norddeich, the homeport of FRISIA Offshore (FO) vessels in Northern-Germany. Wind Force II is a sistership of FO-s Wind Force I and also the fifth vessel within the FO fleet. Altho

1 minutes read
  • LinkedIn
  • X
  • Email

The Christening ceremony of Wind Force II, a wind farm catamaran built by Baltic Workboats, occurred end of May 2013 in Norddeich, the homeport of FRISIA Offshore (FO) vessels in Northern-Germany.

Wind Force II is a sistership of FO-s Wind Force I and also the fifth vessel within the FO fleet.

Although, Baltic Workboats has extensive experience in building vessels for a wide variety of applications including catamarans, this is the first Wind Farm service catamaran being built in the Nasva yard.

What makes it special is the fact that the vessel is built to fulfill new DNV HSLC Windfarm Service II requirements. It makes the catamaran to be first vessel ever built to fully comply with these new rules.

Although being second in the series this vessel has many more improved features. Including a totally new and innovative approach to navigation, communication and vessel control and monitoring system. Vessel displacement is reduced by approx. 6 tons down to 73 tons.

The 22,02 m long and 8,0 m wide vessel with a 1,85m draft, is driven by two MTU 10V2000M72 main engines, each of 900 kW at 2250 rpm, providing a speed of 25 knots. Also featuring are two ZF3050 2,5:1 marine gearboxes, two Cummins Onan 27 kW generators and two Sleipner 50 hp hydraulic bow thrusters.

[mappress]

Press release, June 26, 2013; Image: balticworkboats

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago