offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›UK: FP7 MARINET Project Winners to Use Narec Facilities
News

July 4, 2013 · about 13 years ago

UK: FP7 MARINET Project Winners to Use Narec Facilities

The third call results relating to a €9 million EU funded FP7 MARINET Project* (Marine Renewables Infrastructure Network) were announced in June this year. Two projects from Luxembourg applicant, DNAC were successful: Onshore Cable Management System and Nacelle Intervetion Tool Testing (OCMSNITT) We

1 minutes read
  • LinkedIn
  • X
  • Email

The third call results relating to a €9 million EU funded FP7 MARINET Project* (Marine Renewables Infrastructure Network) were announced in June this year. Two projects from Luxembourg applicant, DNAC were successful:

The projects will be granted access to Narec’s marine test site and electrical and materials laboratory from August 2013 onwards.

What Narec will offer

Narec will provide 49 weeks of access to its testing facilities for marine prototype testing, tidal turbine drive train (3MW capacity) and electrical grid integration. Costs of accessing the facility are covered by the EC (through the 7th Framework Programme) for defined periods of access, and a contribution is made towards travel costs.

Narec facilities available for use under the project include:

[mappress]

Press release, July 4, 2013; Image: narec

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago