offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Germany: VSMC Completes Cable Installation at Meerwind Süd/Ost on Time
Grid Connection

July 9, 2013 · about 13 years ago

Germany: VSMC Completes Cable Installation at Meerwind Süd/Ost on Time

Last weekend, VSMC installed the last cable for the Meerwind Süd/Ost wind farms by successfully accomplishing the final pull-in. A total of 3 load outs, 88 inter array cables and 176 pull-ins were completed on time. With safety and quality as a top priority, VSMC finished the challenging project wit

1 minutes read
  • LinkedIn
  • X
  • Email

Last weekend, VSMC installed the last cable for the Meerwind Süd/Ost wind farms by successfully accomplishing the final pull-in.

A total of 3 load outs, 88 inter array cables and 176 pull-ins were completed on time. With safety and quality as a top priority, VSMC finished the challenging project with no recordable incidents.

The offshore wind farms Meerwind Süd/Ost are a 288 MW project located in the German Bight in the North Sea, 23 km north of the island of Heligoland. The wind farm consists of 80 wind turbines with a power output of 3.6 MW each. The location is one of the most promising in the emerging offshore wind market in Germany. RWE Innogy recently contracted VSMC to lay and bury the infield cables for the Nordsee Ost offshore wind farm, also located in the German Bight.

[mappress]

Press release, July 9, 2013; Image: windmw

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

15 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

18 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

25 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

15 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

18 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

25 days ago