offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Gamesa Commissions Spain’s First Offshore Wind Turbine
News

July 25, 2013 · about 13 years ago

Gamesa Commissions Spain’s First Offshore Wind Turbine

The first offshore wind turbine installed in Spain has been commissioned this morning. It is also Gamesa’s first offshore prototype, with 5 MW of nominal power and installed at the Arinaga Quay in Gran Canaria (Canary Islands). This turbine, with a rotor diameter of 128 meters and a total height of

1 minutes read
  • LinkedIn
  • X
  • Email

The first offshore wind turbine installed in Spain has been commissioned this morning. It is also Gamesa’s first offshore prototype, with 5 MW of nominal power and installed at the Arinaga Quay in Gran Canaria (Canary Islands).

This turbine, with a rotor diameter of 128 meters and a total height of 154 meters, will generate enough energy to power 7,500 households a year.

The commissioning of the turbine is a key step in its certification, foreseen in the upcoming months.

Gamesa began the installation of the tower, the nacelle and three blades of the wind turbine in mid-April, with the assembly of the tower, with a total height of 90 meters and manufactured by Windar (joint venture between Gamesa and Daniel Alonso). The nacelle, manufactured at the Tauste (Zaragoza) factory, is 12.5 metres long, 4 metres tall and wide and weighs 72 tonnes.

After the tower hoist, began assembly of the three blades, 62.5 meters long each and 15 tons in weight (the longest produced and transported in Spain), which ended in May. Since then, the company has developed electrical installation works and connection to the network, prior to its implementation.

[mappress]

Press release, July 25, 2013; Image: gamesa

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago