offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Denmark: Sea Consult Takes Delivery of Its First Damen Twin Axe
News

July 30, 2013 · about 13 years ago

Denmark: Sea Consult Takes Delivery of Its First Damen Twin Axe

Danish company Sea Consult ApS has taken delivery of its first Damen Twin Axe as the company prepares to enter the offshore wind market. Based in Marstal, Sea Consult is a new customer to Damen and this will be the first Fast Crew Supplier (FCS) 2610 to be operated by a Danish company. The vessel [&

2 minutes read
  • LinkedIn
  • X
  • Email

Danish company Sea Consult ApS has taken delivery of its first Damen Twin Axe as the company prepares to enter the offshore wind market. Based in Marstal, Sea Consult is a new customer to Damen and this will be the first Fast Crew Supplier (FCS) 2610 to be operated by a Danish company.

The vessel already has work at Belgian and German offshore wind farms for the next year and the company’s new vessel is expected to be deployed in the next two weeks.

The extremely short delivery time was a major reason the Danish company decided to choose the Damen high-speed catamaran. Owner and Managing Director of Sea Consult, Jan Fabricius, says: “Where else can you find a shipyard that has vessels in stock?” A Letter of Intent was signed in early June; Sea Consult and its crew arrived at Damen’s headquarters in Gorinchem, the Netherlands on June 29 and the vessel sailed with its crew and a Damen engineer to Sea Consult’s Danish base, arriving on Sunday evening June 31st.

Mr Fabricius was also on the FCS 2610’s first journey and commented that he was “very satisfied” with the vessel’s performance. “We had seen the Twin Axe FCS 2610 operating at several wind farms and on television and we were particularly impressed by the ‘Axe Bow’.” The revolutionary Damen Axe Bow hull means that resistance is low and this in turn leads to excellent seakeeping behaviour and lower fuel consumption. Mr Fabricius adds: “The Damen FCS 2610 is top in terms of reduced fuel consumption, particularly at low speeds.”

The FCS 2610 is very comfortable for the crew in terms of ergonomics and it is known for its ability to operate smoothly in higher sea states. Sea Consult is considering the possibility of building up a small fleet of the Damen FCS 2610, he adds. “Damen really is very professional, you don’t have to argue if something needs doing, Damen will fix it and they are really nice people to deal with,” Mr Fabricius says.

Chiel de Leeuw, Damen Sales Manager Scandinavia , comments: “Because we build these vessels for stock Damen is able to supply customers quickly and on top of this we were able to offer Sea Consult attractive financial options from Damen Customer Financing.” The vessel was built at Damen Shipyards Singapore, which is a Group specialist in high-speed aluminium craft. “Damen is very much looking forward to seeing Sea Consult’s business grow in this exciting market and hopes that the two companies can develop a long-lasting fruitful cooperation,” says Mr de Leeuw .

[mappress]

Press release, July 30, 2013; Image: damen

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago