offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Denmark: Borkum Riffgrund I Substation Sails Away from Bladt
News

August 1, 2013 · about 13 years ago

Denmark: Borkum Riffgrund I Substation Sails Away from Bladt

Last week, Bladt embarked on load-out and sea fastening of the jacket and substation for the offshore wind farm Borkum Riffgrund I, and today was sail away day. At 9 a.m., the barge with the total of approximately 5,000 tonnes of steel structures left the quay at Bladt Industries, Aalborg, heading f

1 minutes read
  • LinkedIn
  • X
  • Email

Last week, Bladt embarked on load-out and sea fastening of the jacket and substation for the offshore wind farm Borkum Riffgrund I, and today was sail away day.

At 9 a.m., the barge with the total of approximately 5,000 tonnes of steel structures left the quay at Bladt Industries, Aalborg, heading for the German part of the North Sea where Dong Energy is establishing the offshore wind farm Borkum Riffgrund I.

The substation and the jacket each weigh approximately 1,800 tons and were transported be means of multi wheelers to the quay where they were loaded onto the barge, Boabarge 36, with great care and precision. Additionally, eight steel pipes of 150 tons each which will be used to secure the jacket to the seabed have been loaded onto the barge with a crane, and all the structures have then properly been secured in order to make sure they stay on board during the long sail.

Load out, sea fastening and sail away has gone according to plan.

Besides the jacket and the substation, Bladt is also fabricating the 77 monopile foundations for the project.

[mappress]

Press release, August 1, 2013; Image: bladt

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago