offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Australia: BAM-Clough Takes Delivery of Jack-Up and Transport Barge
News

August 30, 2013 · about 13 years ago

Australia: BAM-Clough Takes Delivery of Jack-Up and Transport Barge

The Jack-up “IB-914” and Transport Barge “IB-924” both departed China earlier mid August on its maiden voyage. The new built process for this SEA-1250 was concluded in less than a year’s time and is a record time for this newly developed design. This is the third GustoMSC SEA-1250 Jack-up built and

1 minutes read
  • LinkedIn
  • X
  • Email

The Jack-up “IB-914” and Transport Barge “IB-924” both departed China earlier mid August on its maiden voyage.

The new built process for this SEA-1250 was concluded in less than a year’s time and is a record time for this newly developed design.

This is the third GustoMSC SEA-1250 Jack-up built and the first design with Tubular legs. The “IB-914” is a larger unit than the Pauline and a smaller version of the JB’s 114 & 115 a perfect sized Jack-up for Civil construction works.

The Jack-up has a 300 ton capacity crane and will be capable of operating in 30 meters water depth.

Built in a shorter time period, the “IB-924” Transport barge is dedicated for transporting the “IB-914” and will also function as a support barge during the execution of these Civil projects. Both units will be deployed in Australia on BAM Clough’s near shore civil construction projects. Where the older sister (1982) the “IB-909” has been operating for quite some time.

In Australia a total of five GustoMSC Jack-ups will be operational at several projects. At Dalrymple the Buzzard, Zeebouwer and Santa have been working on a large coal terminal project for quite some time.

Press release, August 30, 2013; Image: gustomsc

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago