offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Global Wind Turbine Demand Expected to Contract by 5 Pct
News

September 2, 2013 · about 13 years ago

Global Wind Turbine Demand Expected to Contract by 5 Pct

For the first time since 2004 global wind turbine demand is expected to contract this year by as much as 5% mainly due to declining demand in the US, Spain and Italy – historically key markets with extensive local supply chains. This has created the need for capacity adjustments while growth opportu

2 minutes read
  • LinkedIn
  • X
  • Email

For the first time since 2004 global wind turbine demand is expected to contract this year by as much as 5% mainly due to declining demand in the US, Spain and Italy – historically key markets with extensive local supply chains.

This has created the need for capacity adjustments while growth opportunities in new and emerging markets and the growing demand for larger wind turbines require additional investment due to local content requirements or logistics. The global supply chain and long held sourcing strategies have been put under pressure creating opportunity for innovation and new business models to optimise the wind power supply chain.

Fundamental shifts in market demand caused by changes in support policies, power demand projections and overriding macroeconomic factors are causing substantial capacity adjustments in traditional wind power supply chain manufacturing hubs. Unstable support policies in key wind markets such as the US and Spain have already resulted in significant redundancies and facility closures in the last twelve months, having a major impact on the global supply chain. Turbine OEMs have begun to withdraw production capacity from secondary markets and instead concentrate production in core markets with higher volumes to take advantage of economies of scale.

At the same time a need for expansion and new investments in the supply chain is created partly by growth opportunities in new and emerging markets associated with localization policies like in Brazil and South Africa and partly by the continued drive towards large offshore and onshore wind turbines that require the supply chain to produce longer blades, taller towers, larger diameter bearings and more complex castings.

Increasing competition and low capacity utilisation result in lower margins. In combination with volatility in demand and shortened demand visibility this is putting turbine both OEMs and suppliers as well as long held sourcing strategies under pressure resulting in a window of opportunity for innovation and new business models in the global wind power supply chain.

Vertically integrated wind turbine OEMs contemplate divestitures of in-house supply chain activities. Hybrid sourcing strategies and partnerships designed at striking a balance between cost, cash flow, security of supply, quality, control of proprietary technology and market access are on the rise. Suppliers are diversifying their business areas to reduce dependency on new wind turbine demand and new suppliers and partners are entering the wind industry while others exit.

[mappress]

Press release, September 02, 2013

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago