offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›UK: SHI’s 7 MW Wind Turbine Jacket on Its Way to Installation Site (VIDEO)
Technology

September 2, 2013 · about 13 years ago

UK: SHI’s 7 MW Wind Turbine Jacket on Its Way to Installation Site (VIDEO)

Samsung Heavy Industries’ (SHI) offshore wind turbine jacket began its journey toward Energy Park Fife in Methil this weekend, Paisley.org.uk writes. The jacket was manufactured by Steel Engineering Ltd., based in Renfrew, and was loaded on a 60-metre barge on Saturday, when it started its voyage to

1 minutes read
  • LinkedIn
  • X
  • Email

Samsung Heavy Industries’ (SHI) offshore wind turbine jacket began its journey toward Energy Park Fife in Methil this weekend, Paisley.org.uk writes.

The jacket was manufactured by Steel Engineering Ltd., based in Renfrew, and was loaded on a 60-metre barge on Saturday, when it started its voyage to the site where it will be installed. This 500 tone heavy wind turbine jacket, an integral part of the SHI’s 7 MW offshore wind prototype, is scheduled to be installed this month.

SHI plans to completely erect the 7 MW turbine and put it in operation by the end of this year.

The following video shows the jacket being loaded onto the barge and starting its trip:

[mappress] Offshore WIND Staff, September 2, 2013

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

TechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

14 days ago