offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›UK: Vestas Produces First Blade for Its 8 MW Offshore Wind Turbine
News

September 10, 2013 · about 13 years ago

UK: Vestas Produces First Blade for Its 8 MW Offshore Wind Turbine

Vestas has produced the first prototype 80 meter blade for the V164-8.0 MW – the world’s most powerful offshore wind turbine – at the R&D centre on the Isle of Wight, UK. The blade will now undergo an extensive testing regime to ensure total reliability. The 80 meter blade is the longest ever produc

2 minutes read
  • LinkedIn
  • X
  • Email

Vestas has produced the first prototype 80 meter blade for the V164-8.0 MW – the world’s most powerful offshore wind turbine – at the R&D centre on the Isle of Wight, UK. The blade will now undergo an extensive testing regime to ensure total reliability.

The 80 meter blade is the longest ever produced by Vestas and uses the structural shell design, a proven concept in which the loads of the blade are carried in the shell, rather than using a spar at the centre of the blade.

The length of the blade is the equivalent of nine double decker London buses and the swept area of the rotor will be 21,124m2, larger than the London Eye.

Reliability critical offshore

In order to validate the strength and reliability of the blade it will be tested to its limits for six months, reproducing the challenging wind conditions of the North Sea over a simulated 25 year lifetime.

Chief Technology Officer Anders Vedel explains the tests will provide certainty to customers looking to make large investments in offshore wind:

“ Test and verification of the blade is a critical stage of the development of the V164-8.0 MW, ” he says. “ Moving as much of the verification process as possible into our state of the art test centre ensures the blade, the bearing and other components perform to the high standards our customers expect. ”

The V164-8.0 MW prototype will be installed in the first quarter of 2014 at the Danish national testing centre in Østerild.

[mappress]

Press release, September 10, 2013; Image: Vestas

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago