offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›UK: Unmanned Barge Almost Hits Teesside OWF
News

September 11, 2013 · about 13 years ago

UK: Unmanned Barge Almost Hits Teesside OWF

A 35 metre unmanned barge that was being taken from Stromness to Lowestoft has been reconnected to its towing vessel. Humber Coastguard was first contacted by the towing vessel just before 3am this morning, which reported that the barge was drifting after the tow had parted. The vessel had made a nu

1 minutes read
  • LinkedIn
  • X
  • Email

A 35 metre unmanned barge that was being taken from Stromness to Lowestoft has been reconnected to its towing vessel.

Humber Coastguard was first contacted by the towing vessel just before 3am this morning, which reported that the barge was drifting after the tow had parted. The vessel had made a number of attempts to reconnect but was struggling to do so. The wind at the time was a North Westerley force 6 (25-30mph) with a 3-4 metre swell.

The RNLI Hartlepool all-weather lifeboat was asked to assist and see if they could help reconnect the tow. Another tug vessel was also sent to help.

By this time, there was concern the barge was drifting close to the Teesside offshore wind farm but after a number of attempts, the tow was finally reconnected just after 5am.

Mike Puplett, Watch Manager at Humber Coastguard, said:

“This was a tricky operation in difficult weather conditions. Once made aware the barge was drifting towards the windfarm, we wanted to make sure a tow was re-established as quickly as possible. Luckily this was achieved, and no damage was done.

“The barge and towing vessel has now continued on its journey, and is in regular contact with us to update us of their progress.”

[mappress]

Press release, September 11, 2013

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago