offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›Installation of First AREVA Turbines Starts at Trianel and Global Tech I (Germany)
Technology

September 24, 2013 · about 13 years ago

Installation of First AREVA Turbines Starts at Trianel and Global Tech I (Germany)

The installation phase of the first AREVA M5000 turbines has begun for the German offshore wind farm Global Tech I and Trianel Windpark Borkum in the North Sea. By 2014, these two parks will host 120 turbines (40 at Trianel Windpark Borkum, 80 at Global Tech I) for an installed capacity of 600 megaw

1 minutes read
  • LinkedIn
  • X
  • Email

The installation phase of the first AREVA M5000 turbines has begun for the German offshore wind farm Global Tech I and Trianel Windpark Borkum in the North Sea.

By 2014, these two parks will host 120 turbines (40 at Trianel Windpark Borkum, 80 at Global Tech I) for an installed capacity of 600 megawatts, providing electricity to around 600,000 households. AREVA’s technology will represent at that point, 33% of the 1800 MW of Germany’s offshore wind installed base.

The Trianel Windpark Borkum, with a 200 MW capacity, is located nearly 45 kilometers off the island of Borkum, near the alpha ventus park where six AREVA turbines have been in operation since 2009. The Global Tech 1 park, with a 400 MW capacity, is located at a distance of 110 kilometers from the German coast, which will constitute a world first.

Louis-Francois Durret, Senior Executive Vice-President of AREVA’s Renewable Energies Business Group , said: “By giving us their confidence, our customers Trianel and Global Tech I, have enabled us to reinforce our key player position on the European offshore wind market and positions us favourably to win future contracts in France and the United Kingdom.”

[mappress]

Press release, September 24, 2013; Image: Areva

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

TechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

14 days ago