offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›100th Rotor Blade Loaded at Buss Terminal Stade (Germany)
Operations & Maintenance

October 29, 2013 · about 12 years ago

100th Rotor Blade Loaded at Buss Terminal Stade (Germany)

The 100th rotor blade in this year was loaded onto the Dutch ship Marietje Marsilla of the shipping company DanservanGent/Wagenborg at Buss Terminal Stade, Germany. AREVA’s products manufactured in Stade, and successively delivered in 6 sets of blades, are designed for various wind farm projects in

1 minutes read
  • LinkedIn
  • X
  • Email

The 100th rotor blade in this year was loaded onto the Dutch ship Marietje Marsilla of the shipping company DanservanGent/Wagenborg at Buss Terminal Stade, Germany.

AREVA’s products manufactured in Stade, and successively delivered in 6 sets of blades, are designed for various wind farm projects in the German North Sea. The 56 meters long rotor blades are thereby brought via a purpose built dike crossing directly from the manufacturing plant to the port.

The loading is done with two cranes in tandem operation with Gerd Buss Stevedoring’s personnel, trained specially for the requirements of the offshore industry.

“We are pleased with our port services being part of the logistics chain for the construction of the German offshore wind farm, and thus contributing to the development of renewable energy,” said Peter Steinmeyer, CEO of Buss Terminal Stade .

Stade Buss Terminal, the smallest of the Seaport Terminal Buss Port Logistics is designed as a multi-purpose handling system, and has proved its efficiency and quality of work through various successful loadings.

[mappress]

Offshore WIND Staff, October 29, 2013; Image: Buss Terminal Stade

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & Maintenance

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series
Business & Finance

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series

25 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago
Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series
Business & Finance

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series

25 days ago