offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›The Netherlands: Deltares to Form JIP SAFETRENCH
Grid Connection

October 31, 2013 · about 12 years ago

The Netherlands: Deltares to Form JIP SAFETRENCH

Deltares aims to team up with the corporate sector and top research institutes to launch an international research project focusing on the safe burial depth of sea cables against encounters with ships’ anchors. The R&D project will be conducted in the form of a Joint Industry Project (JIP) named SAF

2 minutes read
  • LinkedIn
  • X
  • Email

Deltares aims to team up with the corporate sector and top research institutes to launch an international research project focusing on the safe burial depth of sea cables against encounters with ships’ anchors.

The R&D project will be conducted in the form of a Joint Industry Project (JIP) named SAFETRENCH. Interested parties are invited to attend a workshop in November and/or a webinar in December.

Deliverables and schedule

While the first results are expected within a year, already two years after its start the project will yield deterministic as well as probabilistic anchor models and a guideline how these models can be used for cable protection analyses. A description of the content of SAFETRENCH can be found in this flyer.

Participation and influence

Deltares is not just looking for Participants who want to join SAFETRENCH and co-invest in this research program. They invite active contribution to optimize the project in interaction with the participants. Important steps in this direction are now scheduled and consist of an informative Workshop and a Webinar. At these occasions they will discuss both the technology and the business proposition:

Workshop on the EWEA Offshore conference in Frankfurt on Wednesday 20 November 2013 at 16.00 -17.30 hours local time in meeting room “FACETTE”, in hall 3.Via, west side. Please inform us if you are planning to attend this presentation.

Webinar: Friday 6 December 2013, at 14.00 hours (Amsterdam time: GMT +1 hour).

[mappress]

Press release, October 31, 2013

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

18 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

25 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

18 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

25 days ago