offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›VIDEO: Boskalis in West of Duddon Sands Project
News

November 7, 2013 · about 12 years ago

VIDEO: Boskalis in West of Duddon Sands Project

In September, the first turbine was installed at the West of Duddon Sands offshore wind farm in the East Irish Sea, approximately 14 km from the nearest coast on Walney Island, Cumbria. A total of 108 wind turbines will be installed by the Sea Installer and Pacific Orca, with the wind farm expected

2 minutes read
  • LinkedIn
  • X
  • Email

In September, the first turbine was installed at the West of Duddon Sands offshore wind farm in the East Irish Sea, approximately 14 km from the nearest coast on Walney Island, Cumbria.

A total of 108 wind turbines will be installed by the Sea Installer and Pacific Orca , with the wind farm expected to be fully completed in 2014.

In an Offshore WindForce joint venture, Boskalis Offshore and Volker Stevin Offshore were responsible for the transport and installation of the 108 foundations for the wind farm. Before the monopiles were installed, the Boskalis Rockpiper, the largest fallpipe vessel in the Boskalis fleet, installed 108 perfectly round scour protection filter layers on the seabed.

Offshore WindForce was responsible for the timely delivery of the monopiles and transition pieces from Aalborg in Denmark to Belfast, a journey of 1,500 kilometers. In total, the chartered EIT Palmina undertook 22 voyages to deliver the 108 monopiles and transition pieces. By using the innovative buckets and gripper frames, the world’s largest hydrohammer and state-of-the-art survey equipment, the installation time of the foundations was cut with almost 40%.

VSMC, another joint venture between Boskalis and Volker Wessels is responsible for laying the export cable. After the installation of the cables, a Boskalis fallpipe vessel will place the final scour protection layer around the piles using 95,000 tons of rock.

Check out this video from Boskalis about its work on the West of Duddon Sands project:

[mappress]

Offshore WIND Staff, November 7, 2013; Image: Boskalis

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago