offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›HÅB Seeks Main Contractors for Mejlflak Nearshore Wind Farm, Denmark
Business & Finance

November 25, 2013 · about 12 years ago

HÅB Seeks Main Contractors for Mejlflak Nearshore Wind Farm, Denmark

Havvind Århus Bugt A/S (HÅB), acting through its technical advisor COWI A/S, is seeking main contractors that are interested in becoming pre-qualified for the subsequent tender of the turnkey/EPCI contract for the Mejlflak Wind Farm in the Bay of Aarhus. Profile: Mejlflak Nearshore Wind Farm. Havvin

3 minutes read
  • LinkedIn
  • X
  • Email

Havvind Århus Bugt A/S (HÅB), acting through its technical advisor COWI A/S, is seeking main contractors that are interested in becoming pre-qualified for the subsequent tender of the turnkey/EPCI contract for the Mejlflak Wind Farm in the Bay of Aarhus.

Profile: Mejlflak Nearshore Wind Farm. Havvind Århus Bugt A/S (HÅB), acting through its technical advisor COWI A/S, is seeking main contractors that are interested in becoming pre-qualified for the subsequent tender of the turnkey/EPCI contract for the Mejlflak Wind Farm in the Bay of Aarhus.

COWI A/S has been employed by HÅB as owner’s engineer and will as such make and receive all communication relating to prequalification and subsequent tendering. The requested supply comprises the turnkey/EPCI delivery of a nearshore wind farm south of Mejlflak outside Århus in Denmark. The construction of the wind farm is scheduled to start June 30, 2014, and its completion is expected by the end of 2017.

The wind farm shall consist of up to 20 wind turbines each of 3-6 MW and maximum tip-height of 150m. Shortest distance to shore will be 4 km. Sea depth at site is 10-20m. Soil conditions are strong till clay with 1-5m weak soil at sea bed – steel monopile and concrete gravity foundations are possible. Sea conditions are very calm compared to North Sea.

Substation will be situated onshore and shall not make part of the tender. Power shall be delivered onshore at 33 kV or 66 kV. The wind farm is expected to consist of two separate groups of each 10 wind turbines. The project has received a preliminary EIA-approval allowing offshore construction works from September to April only. Supplementary geotechnical investigations are under preparation and results will be provided with the invitation to tender.

Optimisation of micro siting is ongoing. As a part of the invitation to tender, Employer will look for technology which demonstrates Cost-of-Energy improvements and has potential for support under the coming Danish call for nearshore wind farm research subsidies.

The foregoing technical information is preliminary and may be updated as project planning continues. The projected start and completion dates for the project are indicative only and are likely to change.

Interested parties must either be main contractors acting on behalf of itself and a team of subcontractors, or form consortia able to supply the complete turnkey/EPCI wind farm package. The tender will be functional and will request tenderers’ ROI-optimising ideas for the wind farm supply to be delivered (such as ideas to avoid transmission losses in cables and similar).

The scope of the full one-package turnkey/EPCI wind farm supply will be specified in the invitation to tender, and will include but not be limited to the following:

a) Wind turbines with towers b) Installation of wind turbines c) SCADA d) Foundations e) Design of foundations f) Installation of foundations g) Full geotechnical investigations h) Design wind documentation and metocean condition documentation i) Appurtenances to a minimum level decided by tenderer j) Array-cabling including connection to wind turbines k) Export-cabling from wind farm to shore up to 150m on land including connections to land cables l) Installation of cables at minimum 1 m depth m) Fibre optical cabling, including installation and connection to wind turbines n) All interfacing between wind turbines, foundations, cabling, SCADA etc. o) Coordination of all works at site – including vessel and staff supervision p) Testing and commisioning of wind farm q) Up to 15-20 years Operation and Maintenance as options for the client including crew vessels and onshore facilities. O&M scope will be described in the tender materials r) Project certification according to currrent rules and regulations including those issued by the Danish Energy Authority. including wind turbine approval and foundation design verification s) Grid code compliance, system integration t) All interfacing between EPCI contractor, grid operator, authorities etc. u) Description of decommissioning and removal procedure

Deadline for submission of tenders is February 12, 2014.

[mappress]

Offshore WIND Staff, November 25, 2013; Image: ramboll

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago