offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›GL Certifies CPNL Engineering’s Diverless Spreader Beam
Grid Connection

December 4, 2013 · about 12 years ago

GL Certifies CPNL Engineering’s Diverless Spreader Beam

Germanischer Lloyd has granted a design certification for CPNL Engineering’s diverless spreader beam which will be used for the Baltic cable joint this winter period. The design of the spreader bar for lifting of bending restricted cables is considered in line with Germanischer Lloyd rules for class

1 minutes read
  • LinkedIn
  • X
  • Email

Germanischer Lloyd has granted a design certification for CPNL Engineering’s diverless spreader beam which will be used for the Baltic cable joint this winter period.

The design of the spreader bar for lifting of bending restricted cables is considered in line with Germanischer Lloyd rules for classification and construction for offshore technology. It is the first certificate CPNL Engineering received in its career. The spreader beam will be used with a working load limit of 33 tons together with CPNLs articulated pipe 300-333, which was recently tested in a three-point-bending test with a result of 489 kN.

The spreader beam is a diverless concept with a compressed air solution to release the joint on the seabed. Next week CPNL Engineering will test the spreader beam together with cable joint and pipes before release offshore.

Press release, December 4, 2013; Image: cpnl

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

15 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

18 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

25 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

15 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

18 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

25 days ago