offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›Geotechnical Survey to Begin at Burbo Bank Extension (UK)
R&D

December 23, 2013 · about 12 years ago

Geotechnical Survey to Begin at Burbo Bank Extension (UK)

In the early part of the new year, a geotechnical ground investigation will commence at the site of a proposed extension of Burbo Bank offshore wind farm. This survey consists of a combination of Deep Boreholes with Cone Penetration Testing (CPT’s) at selected positions, as well as shallow Vibracore

1 minutes read
  • LinkedIn
  • X
  • Email

In the early part of the new year, a geotechnical ground investigation will commence at the site of a proposed extension of Burbo Bank offshore wind farm.

This survey consists of a combination of Deep Boreholes with Cone Penetration Testing (CPT’s) at selected positions, as well as shallow Vibracore and adjacent CPT’s.

Burbo Bank Extension project is an extension to the existing Burbo Bank Offshore Wind Farm, which is covering an area of 40 km². With an estimated generating capacity of up to 250 MW, it is located west of the operational Burbo Bank Offshore Wind Farm in Liverpool Bay, around 7 km north of the North Wirral coast, 8.5 km from Crosby beach, and 12.2 km from the Point of Ayr on the Welsh coast.

[mappress]

Source: KIS-ORCA, December 23, 2013; Image: dongenergy

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago